Propylene Station Project

Location: Port Said – Egypt

Scope Of Work:

  • Resolving alignment issues related to corner angles in air systems
  • Optimizing timing adjustments for gas flow control
  • Ensuring precise synchronization of underground pipeline grid operations

Owner: Muhammad Farid Khamis

Project Description:

The Propylene Station Project in Port Said required specialized engineering solutions to address critical alignment and timing challenges within the gas distribution network. A key aspect of the project involved resolving the issue of adjusting corner angles in the air system to facilitate precise gas flow regulation. This optimization was crucial in ensuring efficiency and safety in gas transmission.

Additionally, precise timing adjustments were implemented to synchronize gas flow with operational demands, enhancing overall system performance. The project also focused on fine-tuning the time fraction of the underground pipeline network to achieve seamless coordination between various distribution lines.

By employing advanced engineering techniques and precise calibration methods, the project successfully improved the stability and efficiency of the station’s operations, ensuring safe and reliable gas distribution across the network.